Communication Network - Nº25 - page 51

nuel Alcaide, the building’s supervisor, for
their involvement in securing this certificate,
a useful tool for improving energy perfor-
mance and for consistently complying with
current regulations in this respect.
This system is implemented for managing
energy and the various installations / main-
tenance of the building, such as electricity,
temperature control, control of the facilities,
etc. The aim is to optimise and rationalise
the use of energy while ensuring complian-
ce with the various legal requisites for buil-
ding management.
One of the key milestones was the reduc-
tion of contracted power by more than 60%
(estimated annual savings of 35,000 euros)
which has made it possible to reduce elec-
tricity consumption by about 6%.
Work is currently being carried out in inves-
tment projects to reduce power consump-
tion by installing LED light fixtures in the
parking facilities and elevator lobbies.
José María Seoane and Mario Sánchez give the certificate to Carlos González Monar
and Juan Manuel Alcaide.
The team which contributed to the Energy Management System certified by Aenor.
s o c i a l
r e s p on s i b i l i t y
1...,41,42,43,44,45,46,47,48,49,50 52,53,54,55,56,57,58,59,60,61,...97
Powered by FlippingBook