Background Image
Table of Contents Table of Contents
Previous Page  21 / 82 Next Page
Information
Show Menu
Previous Page 21 / 82 Next Page
Page Background

u s i n e s s

The drinking wáter treatment plant in Cutzamala.

Oher projects in Chile

FCC’s water management company has also been chosen by the Chilean com-

pany, Codelco, to perform groundwater treatment services using a nanofiltra-

tion plant for the Ovejería hydraulic barrier in Huechún, Metropolitan Region.

Worth 12 million Euros, the contract contemplates the engineering, construction

and commissioning of a nanofiltration plant with a production capacity of 100 li-

tres per second, as well as operation and maintenance for a 12-year period. The

aim is to ensure guaranteed quality water intake with a low dissolved salt content.

The Colina and Batuco communities, to the north of the Santiago de Chile me-

tropolitan area, will benefit from the construction of the new Cadellada treatment

plant, to be built by FCC Aqualia. The new plant, with a treatment capaci-

ty of 330 litres per second, will handle the needs of nearly 150,000 residents.

This turnkey project, valued at 15million Euros, includes the design, equipment, cons-

truction, commissioning and temporary operation to take place over a year and a half.

Subsequently, the company will offer operational assistance for one additional year.

Steel pipes.

Control building.