Mar de Aneto, the floating

dry-dock designed for

building breakwaters, docks,

and jettiesis 46.8 metres

long and 32 metres wide.

a breakwater stretching 320 metres) at the

city’s port.

Continuous innovation

Maritime works are challenging because of

the technical complications posed by the

maritime environment and determined by

storms, tides, the complex phenomena of

wave-soil interaction and the severe envi-

ronmental conditions that challenge the du-

rability of the infrastructure. The research,

development and innovation (R+D+i) ac-

tivities carried out by FCC Construcción

help in the development and implemen-

tation of the best possible solutions for

each situation. An example is its patent for

low-reflection vertical wall for caissons for