Page 44 - FCC 120 years
P. 44

1990 2000








          We advance towards sustainability with

          the first ecological solid waste trucks                                                                                                                                    Construction work began on
                                                                                                                                                                                     the Puerta de Europa towers
                                                                                                                                                                                     on Plaza de Castilla in Madrid,   In 1992, Construcciones
          In Madrid we began using the very first ecological solid urban waste collection trucks,                                                                                    a landmark architectural   y Contratas, S.A. merged
          powered by liquefied petroleum gas to considerably reduce noise and pollutant gas                                                                                          complex with inclined      with Fomento de Obras y
          emissions.                                                                                                                                                                 towers each measuring 144   Construcciones, S.A. (FOCSA),
                                                                                                                                                                                     metres in height positioned   to create Fomento de
                                                                                                                                                                                     symmetrically over the Paseo   Construcciones y Contratas,
                                                                                                                                 Puerta de Europa towers. Madrid.                    de la Castellana thoroughfare.   S.A. (FCC).

        1990











          In 1993, Portland Valderrivas,   The Las Fuentes Bridge over                                                                                     Spain's first high-speed   The Higher Architectural
          S.A. integrated its industrial,   the River Ebro, built by FCC                                                                                   railway was launched      Council of Spain bestowed
          cement and concrete       as part of the 2nd Zaragoza                                                                                            between Madrid and Seville.   its 1993 Spanish Architecture
          production operations with   Arterial Belt Network, won                                                                                          Our company played a major   Award for the best project of
          Cementos Portland and     the Construmat 91 Award                                                                                                role in the project, with the   the period 1991-1992 on the
          Cementos Hontoria, giving   as the best civil engineering                                                                                        construction of the two   Seville-Santa Justa railway
          rise to the Cementos Portland   project of the year.                                                                                             terminal stations, Madrid-  station in the Andalusian
          Group.                                                                                                                                           Atocha and Seville-Santa   capital, which likewise
                                    We were the first Spanish                                                                                              Justa, as well as various   received an accolade from
                                    construction company to be                                                                                             sections of the track.    the Ministry of Public Works,
                                    awarded the AENOR quality                                                                                                                        Transport and Environment.
                                    certificate.




                                                              El Alto cement plant in Morata de                                                                                                                 San Marcos leachates
                                                              Tajuña. Madrid.                                                                            Santa Justa station, Seville                           treatment plant. Guipúzcoa.

     44                                                                                                                                                                                                                        1990 2000  45
   39   40   41   42   43   44   45   46   47   48   49