Page 35 - FCC 120 years
P. 35

Collection truck equipped for manual
                                                                                            hermetic collection of solid urban
                                                                                                     waste. Barcelona.














 During the decade road
 cleaning services brought in
 Interior of the   the first automatic loading
 recycling and   80-litre bins and 800-litre
 composting plant.
 Tarragona.  containers.

                                                                             1970











 Street cleaning service.   Our Group laid the Calle
 Barcelona.
 O’Donnell - Avenida de
 América section of the M-30
 motorway in Madrid.

 Work began on the Madrid
 Metropolitan railway with the
 new Pacífico-Oporto line, the
 first tunnel in Spain to use the
 shield boring technique and
 a mechanised system to line
 the tunnel with prefabricated
 concrete sections immediately
 after boring.


 Madrid Metro. Oporto-Lago section.

 34                                                                                                     1960 1970  35
   30   31   32   33   34   35   36   37   38   39   40