FCC
in
Peru
Lima’s metro system
A few months ago, a consortium headed by ACS and FCC was awarded
a contract worth 3.9 billion euro to design, build, finance, operate and
maintain line 2 of Lima Metro and a spur from Line 4 to the airport.
Construction is expected to take five years, after which the consortium will
operate the lines for 30 years.
Fernando Moreno, chairman of FCC Construcción at the centre of the photo speaks with Carlos
Paredes Rodríguez, the minister of Transport and Communications on his right after signing the
contract on 28 April.
Watch