Page 51 - FCC-N8-eng

This is a SEO version of FCC-N8-eng. Click here to view full version

« Previous Page Table of Contents Next Page »
Place
The
With a length
equivalent to that of four
soccer felds, some of
the gates are as tall as
a 10-storey building.
to having to live together with a colony of
famingos, fshing eagles, and black kites in
the dredging area which, instead of being
afraid, were attracted by the operations”.
In addition to improving transport and fa-
cilitating the city’s development, the pro-
ject involved many environmental aspects.
Preliminary measures included geotechni-
cal prospecting, drafting of an archaeolo-
gical intervention project, the preparation
of a report on protected fauna and fora,
and strict compliance with environmental
monitoring measures.