construction The central pylon is 80m high and is lower than the other two pylons, a 110m high tower on the north side and a 125m high south tower. The project was executed in accor- dance with the highest environmen- tal standards. The bridge design was based on the premise of the mini- mum impact to the environment with 1,423,225 tonnes of materials recove- red and reused in the construction process. B U S I N E S S B U S I N E S S 23