The agreement for the Hydraulic Adaptation and Environmental Re- covery Project of the Bogotá River was signed in December 2012. Work has consisted of the expan- sion of the river (from 30 to 60 me- tres width) by relocating the lon- gitudinal mounds, deepening and enlarging the riverbed. The goal of the project is to obtain better hy- Adaptation of hydraulic works and recovery of River Bogotá An environmental and socially necessary project C O M M U N I T I E S C O M M U N I T I E S 44