We are FCC - Nº15

Romania continues to prove itself as one of the emerging powers in Euro- pe in recent years. The health crisis the world is going through has not stopped FCC’s activity in the cons- truction of line 5 of the Bucharest metro. A truly ambitious project, in addition to contributing to the impro- vement and remodelling of one of the city’s most important infrastruc- tures, the aim of the initial objecti- ve was to expand and improve the mobility of the two and a half million people of Bucharest who live in its metropolitan area. Ten stations The project, carried out by FCC Construcción, included the design and construction of section 1 of line 5 of the Bucharest Metro, arranged between the Raul Doamnei and Eroilor stations and materialized in the opening of 10 new stations. The amount of the contract, which differs from the execution of these services on line 5 of the Bucharest subway, exceeds 400 million euros. A total of 7.7 kilometres of tracks in two tunnels, as well as a 260-meter gallery that connects to Metro Line 1 were main the works executed as The Valea Ialomitei station, which also functions as a warehouse and workshop, connects the southeast area of Bucharest and the city center. Drumul Taberei Park Station. part of this project. Both tunnels were built with two tunnel-boring machi- nes with a diameter of 6.60 meters. On the other hand, the reform has also covered replacement works of several affected services, as well as external urbanization, track infras- tructure, electromechanical installa- tions and ticketing, as well as inte- rior finishes of the stations. C O M M U N I T I E S 53 C O M M U N I T I E S

RkJQdWJsaXNoZXIy NTQ2MjA=