Page 53 - FCC_N18_eng

Basic HTML Version

ped and used in numerous infrastructures.
The fundamental construction concept con-
sisted of incorporating a railway and roads
in the same bridge; the railway runs along
the centre while the roads at each side of
the tracks.
The project
It is a Bulgarian project consisting of the
construction of a combined bridge, with a
total length of 1,791 for the road section
and 1,791 metres for the railway. It has four
traffic lanes, a railway with a simple elec-
Julio Ruiz Cabrero, general manager of Desmond Bridge.
t h e p l a c e