Page 97 - FCC-N14-eng

Basic HTML Version

o m m u n i t i e s
FCC,
the only
Spanish
company
The FCC Group was responsible for the
design, outfitting, maintenance, and dis-
mantling all the interior architecture and the
electrical and mechanical installations at
the International Broadcasting Centre from
which the London 2012 Olympic Games
and Paralympics were broadcast.
Thanks to this project, FCC was the only
Spanish company involved in building in-
frastructures for the Olympics celebration in
the British capital.
The media centre occupied 56,000 m2
which hosted more than 21,000 accredited
at the London Olympic Games
professionals from all over the world. More
than 900 million people from all parts of the
planet watched the inauguration ceremony