Page 41 - FCC-N14-eng

Basic HTML Version

Construction of the new pavilion
of the Salzburg Exhibition Centre completed
Built according to the blueprints of the Ka-
da-Wittfield architecture firm, the 10-metre
high pavilion is divided into nine different
areas. The adjacent 4,600 m
2
building hou-
sing the conference halls and an auditorium
with modern acoustic ceilings and mobile
separation panels was also completed.
The new pavilion and its conference areas
provides the exhibitors at the Salzburg Ex-
hibition Centre 39,170m
2
of floor space .
The new centre, with capacity for up to
6,000 people, will bolster Salzburg’s posi-
tioning in the conference and convention
industry. “We wanted to create a modern
infrastructure so that Salzburg could remain
a comp0etitive exhibition venue”, Daniel
Brenner, the vice-governor of the province
of Salzburg said. He also highlighted that
this new infrastructure would be a major
boost for the local economy.
The steel structure that covers the pavilion
weighs 1,200 tons. More than 350 km of
cables were installed and about 200 one-
family homes could fit just in the exhibition
area. Worth 34 million Euros, Salzburg’s
“Pavilion 10” is one of the largest inves-
tments ever made by the entity since its
founding. The completed steel and glass
building was presented to the public at a
press conference on 10 August of this year.
u s i n e s s